Leave a Message

* Name
* Email
* Tel
* Countries & Regions
* Purchase Time
* Detail

Item Details

Specifications
Benefits
Equipment
Engine
Engine Model
Mitsubishi 6D24-TLC1B
Displacement
11.945L
Rated Power
250/2000kw/rpm
Operating Weight
Std. Operating Weight
45500kg
Hydraulic System
Hydraulic Motors - Travel
Nabo GM85VA
Hydraulic Motors - Swing
Kawasaki M5X130CHB-10A-49A(Double)
Boom Cylinders - Bore
160mm
Boom Cylinders - Stroke
1570mm
Arm Cylinders - Bore
190mm
Arm Cylinders - Stroke
1800mm
Bucket Cylinders - Bore
170mm
Bucket Cylinders - Stroke
1270mm
Service Capacities
Fuel Tank Capacity
680L
Hydraulic Tank Capacity
400L
Engine Oil
49L
Cooling System
21L
Final Drive (each)
10L
Swing Drive (each)
10.5L
Undercarriage
Track Shoes Number
50
Carrier Roller - Perside
2
Track Roller - Perside
9
Working Range
Max.Digging Force - Bucket
267kN
Max.Digging Force - Arm
241kN
Max.Digging Height
10705mm
Max.Digging Depth
7285mm
Max.Vertical Digging Depth
5495mm
Max. Excavating Distance
11560mm
Min. Swing Radius
5050mm
Height at Min. Swing Radius
9330mm
Transmission
Travel Speed - Highest
4.9km/h
Travel Speed - Lowest
3.2kw/h
Swing Speed
10rpm
Gradeability
70%/35°
Std. Operating Weight
77kPa
Dimensions
Transportation Length
12200mm
Transportation Width
3180mm
Transportation Height
3690mm
Upper Body Width
3180mm
Cab Height
3510mm
Std.Track Width
600mm
Track Gauge
2740mm
Min.Ground Clearance
590mm
Tail Swing Radius
4410mm
Roller Gauge
4410mm
Track Length
5440mm

The 45.5 ton SY465H uses the customized Mitsubishi 6D24-TLC1B Engine to deliver 250/2000 kW/rpm power.

 

CUSTOMIZED ENGINE FOR HIGH EFFICIENCY AND LOW CONSUMPTION
With dual-pump, dual circuit constant power control system, the engine fully develops its power to realize the maximum efficiency under different working mode.
Full-power variables main pump
The two plunger-type pumps of serial variable displacement are controlled via full-power variables, to make the consistency of the two pumps power.
Newly-designed controller
The newly-designed controller is used to perform innovative electro-hydraulic control over the machine, achieving a real-time power match between the engine and the hydraulic pumps. An advanced computer dynamic control system changes engine output power as per the external load demand, realizing the optimum control of the machine and the external load operation system.

 

CONFORTABLE OPERATION
The spacious and sealed cab is not only creating quiet environment for the operator, but ensures the air pressure inside is higher the outside, preventing the dust invasion. The innovative silicone rubber shock absorber, equipped in the operator station, minimizes the shock brought by the rough road condition or hydraulic impact, considerably increasing the stability of the cab and improving the comfort of the operator.
Multiple air outlets at different levels and locations give the operators more comfort, especially under stuffy environment.

 

SAFETY
Falling object protection structure
The cab is punch-formed with thick high-strength steel sheet, and the toughened glass-made door and window, together with the equipped seat-belt, creating a quite safe environment for the operators.
Much more extensive view
The improved cab design elements the previous narrowed blind zone, by reducing the colomn size and decreasing the structural strength of the cab.
Strengthened working equipment meets heavy-duty requirements
The strengthened boom, arm, and bucket are designed to meet the requirements of heavy-duty operations. New anti-deformation new welding process ensures the correct, strong and durable structure.
The large-box structure is welded with high-intensity steel sheet, with the welded plates against torsion inside to form a compact, strong and durable integrity and prevent deformation under larger digging force.
The boom is fully reinforced in key positions in addition to thickened bent plates as the front support and thickened side plates as the rear support, offering excellent torsion resistance under complex applications.
Reinforced X-frame modeled with digital tools, through finite element analysis on loading capacity, realizes high-strength structure.

OPTIONAL EQUIPMENT

►Hammer pipe lines

Saudi Hammer pipe lines

Half protection cabin

Full protection cabin

Fuel fill pump

Working flash lamp

Travel acoustic alsrm

Power boost

Thick undercover

Track: 700mm/800mm